Staff sizing as a service

Optimized staffing.
Modeled cost.
Every tender.

Turnomix sizes staff for each tender and models its cost, shift by shift, using the labor parameters configured for the operation. Replace spreadsheet assembly with assumptions your team can review.

The problem

The cost of eyeballing your staffing

Working out how much staff you need to cover a contract, on which shifts, with what relief pattern, and at what cost, is a manual exercise you redo whenever a condition changes: a 12-hour shift instead of 8, a public holiday, or a new clause. That variability can affect the proposal margin when assumptions remain hidden.

Hours in spreadsheets for every proposal.

Operational and labor rules that are difficult to review consistently.

Costs that are difficult to compare when assumptions change between scenarios.

How it works

From tender to proposal, in six steps

INPUT
Tender
01
Requirements
02
Staff
03
Shifts
04
Costs
OUTPUT
Proposal
TenderINPUT

Upload the process or contract you want to cover: what service, where, when.

Requirements01

Define your coverage demand: how much staff you need, in which time slots, all seven days, including public holidays and night shifts.

Staff02

Turnomix calculates a feasible mix of core and backup staff for the configured coverage and parameters.

Shifts03

Builds the shift schedule that covers demand, testing different strategies: relief, overtime, 8- or 12-hour shifts.

Costs04

Models each scenario's cost with the labor parameters configured for the contract.

ProposalOUTPUT

Delivers the staffing, shift, and cost breakdown, ready to support your tender bid.

Screenshot of Turnomix: optimizer proposal ranking with cost and coverage per strategy
Why Turnomix

Three reasons to ditch the spreadsheet

Explicit, reviewable assumptions

Every proposal uses an optimized calculation and reports cost within the configured scenarios and constraints, so the team can review its assumptions.

§

Configurable, reviewable rules

Working-hour limits, rest periods, and surcharges can be configured in the engine and reviewed for each operation before a scenario is used.

Scenario comparison

There's no single answer. Compare different shift strategies for the same contract and choose the one that best balances cost and operational risk.

Build your next proposal on numbers, not assumptions.

Request a demo